How do I check a drawing before it's released to the shop?

Have someone other than the author check it against a short written checklist: title block and revision, material and finish, every feature dimensioned and toleranced, and notes a shop can act on. The checker marks up a PDF, the author answers every mark, and the drawing counts as released only once it's in the released folder with a revision.

Why small teams skip the check

On a team of two to five engineers, the person who made the drawing is usually the only one who knows the part. Checking feels like a formality, so drawings go out after the author's own look, and the shop finds what was missed.

When there is a check, it often depends on one senior engineer. One small team told us every design review waits on their engineering manager, who ends up catching title-block errors, typos and missing dimensions instead of looking at how parts fit together. The quality of the check depends on who does it, because there's no checklist.

A checklist fixes both. Anyone on the team can do the first pass, and the senior engineer's time goes to the questions only they can answer.

Worked example: 160-0042 sensor bracket, first release

The bracket is a 1.5 mm aluminum sheet-metal part with two bends, a slot and four holes. The author has finished the drawing; another engineer checks it. The checklist lives in the team's shared folder and is the same for every part.

# Check 160-0042
1 Title block: part number, name, revision, material, finish, scale, units Finish missing
2 Drawing matches the current model (measure a few features) OK
3 Every feature located and sized OK
4 Every dimension toleranced, directly or by the general tolerance block Slot width had no tolerance
5 No duplicate or conflicting dimensions OK
6 Datums make sense for how the part is held and mated OK
7 Sheet metal: flat pattern, bend direction and bend radius shown Bend direction not shown
8 Notes are specific and something a shop can act on OK
9 Hardware and inserts called out with part numbers OK
10 Revision block filled in for this release OK

Item 4 comes from the basics of dimensioning. The fundamental rules of ASME Y14.5, as summarized by eMachineShop, include that all dimensions must have a tolerance and that dimensions and tolerances must completely define the geometry and its allowable variation (eMachineShop).

Step 1: The author self-checks first. Run the same list before asking anyone. It's quicker for the author to catch the obvious misses.

Step 2: The checker marks up a PDF, not the native file. Export the drawing to PDF, mark each issue on the sheet, and number the marks. The checker doesn't fix anything; they only find.

Step 3: The author answers every mark. Fix it, or reply with why it stays. For 160-0042, the author added the finish note, toleranced the slot, and added the bend direction.

Step 4: The checker looks once more. Only at the marks, not the whole sheet again.

Step 5: Release. The drawing becomes Rev A only when it's in the released folder, with a matching STEP and the checker's initials in the title block:

/160-0042 Sensor bracket/
  /released/
    160-0042_RevA.pdf
    160-0042_RevA.step
  /check/
    160-0042_RevA_check-marks.pdf

Export the PDF and STEP from the same revision; see The STEP and the drawing disagree: which does the shop build to?

Ways to check a drawing

Method Good for Main risk
Author self-check Catching obvious misses fast You don't see what you didn't think of
Peer check with a written checklist Small teams; consistent results Only as good as the checklist
Senior engineer review Fit, function and process questions Becomes the bottleneck if it covers everything
Ask the shop Manufacturability questions Late; they'll quote what you send, as it is
Formal checker role Larger teams releasing many drawings Overhead a team of three can't carry

Shop input is still worth asking for on features you're unsure of; see How do I ask a supplier for DFM feedback before release?

When this stops working

  • The shop keeps finding the same kinds of issues.
  • Drawings wait days for a checker.
  • The checklist hasn't changed since it was written.
  • Nobody can tell which version of a drawing was checked.

At that point the check needs to be tied to the revision itself, with the marks and answers kept alongside it, not in a separate folder.

FAQ

Who should check a drawing on a small team?

Anyone who didn't make it. A second engineer with a written checklist catches most misses, and the senior engineer can then focus on fit, function and process.

What should a drawing checklist include?

The title block and revision, material and finish, every feature located, sized and toleranced, no duplicate dimensions, sensible datums, and notes a shop can act on. Add the items your shops keep finding.

When is a drawing actually released?

When it has a revision, it has been checked, and it's in the place everyone gets drawings from. A PDF in an email is not a release.

Should the shop check my drawing for me?

Ask them about features you're unsure of, before release. Don't rely on them to find missing tolerances; many will quote and make what's on the sheet.